(A) If X is deleted, then Y is also deleted
(B) If Y is deleted, then X is also deleted
(C) If Y is deleted, then X is not deleted
(D) All of the above
What kind of mechanism is to be taken into account for converting a weak entity set into strong entity set in entity relationship diagram?
(A) Aggregation
(B) Generalization
(C) Specialization
(D) Adding suitable attributes
First step in Software Development Life Cycle is?
(A) System Design
(B) System Testing
(C) Preliminary investigation and analysis
(D) Coding
Software Requirement Specification (SRS) is also known as specification of _______.
(A) Acceptance Testing
(B) White Box Testing
(C) Black Box Testing
(D) Integrated Testing
Which testing is the re-execution of some subset of tests that have already been conducted to ensure the changes that are not propagated?
(A) Regression testing
(B) Unit testing
(C) Integration testing
(D) Thread-based testing
Mention any two indirect measures of product.
(A) Quality
(B) Efficiency
(C) Accuracy
(D) Both A and B
Give the Real-world factors affecting maintenance Cost.
(A) As technology advances, it becomes costly to maintain old software.
(B) The standard age of any software is considered up to 10 to 15 years.
(C) Most maintenance engineers are newbie and use trial and error method to rectify problem.
(D) All mentioned above
Effective software project management focuses on the four P’s. What are those four P’s?
(A) People, performance, payment, product
(B) People, product, process, project
(C) People, product, performance, project
(D) All of the above.