(A) 130
(B) 189
(C) 232
(D) 289
Scheduling is done so as to?
(A) Keep the waiting time the same
(B) Increase the waiting time
(C) Decrease the waiting time
(D) None of the above
In priority scheduling algorithms when a process arrives at the ready queue its priority is compared with the priority of?
(A) Currently running processes
(B) All processes
(C) Init processes
(D) Parent processes
CPU scheduling is the basis of?
(A) Larger memory sized systems
(B) Multiprogramming operating systems
(C) Multiprocessor systems
(D) None of the above
In priority scheduling algorithm?
(A) CPU is allocated to the process with lowest priority
(B) CPU is allocated to the process with highest priority
(C) Both of the above
(D) None of the above
Process are classified into different groups in?
(A) Priority scheduling algorithm
(B) Shortest job scheduling algorithm
(C) Multilevel queue scheduling algorithm
(D) Round robin scheduling algorithm
The model in which the requirements are implemented by its category is?
(A) Waterfall model
(B) Prototyping
(C) Evolutionary Development Model
(D) Iterative Enhancement Model
Alpha and Beta Testing are forms of?
(A) Acceptance testing
(B) Integration testing
(C) Unit testing
(D) System testing